Plant & Machinery Schedule Checks
Schedule inspection and proactive maintenance of machines play the vital role to minimize the production loss and to increase the productivity and helps to grow the facility fast without hindrance. We have the experienced, trained, and qualified LPG expert team to manage this activity.
Schedule Checks:
Preparation of Preventive maintenance schedule of all equipment i.e. LPG storage vessels, Product Pumps, Filling Machines, Loading arms, Weighing Scales Dial / Bar types, Pipe lines and allied fittings etc Daily, weekly, and monthly inspection and checks as per Maintaining records of inspections
Preventive and Breakdown Maintenance
The LPG system operates under pressure and strict compliance of Preventive maintenance, increases the life of machinery and keeps the operation smooth to obtain optimum result and minimizes the risk of incident / accident. Our LPG expert and qualified workforce will carry out these preventive and breakdown maintenance at the facility.
Maintenance & repair Services of the following machinery & equipments are available:
- Centrifugal & Rotary LPG Product Pump
- Semi auto & auto filling machine
- Dial type scale
- Bar type scale
- Loading arms
- Control valves
- Conveyor chain / belt
- Evacuation unit
- Pipelines and allied fittings
- Fire fighting equipments
Annual (01), Five (05) & Ten (10) Years LPG Vessel Inspection and Maintenance
LPG pressure vessels are the most critical part of the system and requires full attention across the service therefore one year, five year & ten-year schedule inspection and maintenance is essential as per LPG code of practice and ASME – V111 div –1 recommendations and to perform this we have trained, qualified & experienced staff to carry out maintenance job as per the code of practice & client’s complete satisfaction.
1 Vessel inspection as per ASME & LPG code of practice
2 Ultrasonic Gauging
3 Internal cleaning / visual inspection
4 Hydro test
5 PRV servicing / calibration or replacement
6 Pressure gauge calibration or replacement
7 Temperature gauge calibration
8 Certification by third-party inspector
9 Painting of vessels