- Fabrication, welding and installation of platform / walkway at top of LPG tanks
- Fabrication, welding and installation of walkway railing at top of LPG
- Fabrication, welding and installation of walkway to connect all the 4 x 25 Mt. LPG through tank plat form.
- Fabrication and fixing of pipe railing across the under ground Fire Water Reservoir